SPIN
step coverings: installation

A noble material shows its effect: Stainless steel is modern, individual and creative applicable. With SPIN ® products, stairs present at a high level and provide the highest standard of safety.

Tiler products (installation with joints / type W and type H)

cement floor

calcium sulfate floor

mastic floor

plain floor

old tiles

prime coat cleaning priming with ARDEX P 51 mix ratio 1:3 with water priming with ARDEX P 82 synthetic resin prime coat priming with ARDEX P 82 synthetic resin prime coat Grundieren mit ARDEX P 82 synthetic resin prime coat
floor-laying of SPIN-tiles type W ARDEX S 28 new ARDEX S 28 new ARDEX S 28 new ARDEX S 28 new ARDEX S 28 new
floor-laying of SPIN-tiles type H ARDEX X 78 ARDEX X 78 ARDEX X 78 ARDEX X 78 ARDEX X 78
wall-laying of SPIN-tiles type W ARDEX N 23 ARDEX N 23 ARDEX N 23 ARDEX N 23 ARDEX N 23
wall-laying of SPIN-tiles type H ARDEX X 77 ARDEX X 77 ARDEX X 77 ARDEX X 77 ARDEX X 77
Verfugung of SPIN-tiles type W + type H ARDEX G6 Flex 1-6 ARDEX G6 Flex 1-6 ARDEX G6 Flex 1-6 ARDEX G6 Flex 1-6 ARDEX G6 Flex 1-6
type W = silicate backing - type H = fine stone backing

Floorer products (installation without joints / type B )

cement floor

calcium sulfate floor

mastic asphalt floor

plain floor

old tiles

preperation cleaning cleaning cleaning cleaning cleaning
prime coat priming with ARDEX P 82 synthetic resin prime coat priming with ARDEX P 51mix ratio 1:3 with water priming with ARDEX P 82 synthetic resin prime coat priming with ARDEX P 82 synthetic resin prime coat priming with ARDEX P 82 synthetic resin prime coat
level out with premixed mortar ARDEX K15 DR ARDEX K15 DR ARDEX K15 DR ARDEX K15 DR ARDEX K15 DR
grinding of the filler e.g. floor sander e.g. floor sander e.g. floor sander e.g. floor sander e.g. floor sander
floor-laying of SPIN floor coverings
type B
Ardex WA or SPIN Epoxi Ardex WA or SPIN Epoxi Ardex WA or SPIN Epoxi Ardex WA or SPIN Epoxi Ardex WA or SPIN Epoxi
type B = vinyl backing

Important Information

Basically all undergrounds have to be checked in regards of the bearing capacity and consistency. Parting agent and dust have to be removed free of residues from the ground previously. Please take care of the informatons in the technical data sheet.